South Albania BESS Project

Vlorë Municipality -

South Albania -

Albania

Phase

Secured

Location

Babica BESS

Commissioned

Capacity

Production

Project lifetime

2024

About The Project

Proposed utility-scale battery energy storage system (BESS) of up to 400 MWh located at the Babica 220 kV substation in southern Albania. The project is part of EU Green Energy’s framework agreement with Energy Vault to deploy large-scale storage assets supporting renewable energy integration and grid flexibility.

Country :

Albania

Region :

South Albania

Municipality :

Vlorë Municipality

Site Name :

Babica BESS

GPS Coordinates :

Financing Status :

Secured

Project Year :

2024

Installed Capacity (Total MW) :

EAP (MWh/year) :

Capacity Factor :

Installed Capacity :

Capacity Factor :

PV capacity DC :

Number Of Turbines :

BESS Power :

EAP :

Land Area :

PV capacity :

Capacity Per Turbine :

BESS Energy :

400

BESS Techology :

Lithium-ion Battery Energy Storage System (BESS)

Connection substation :

Babica 220 kV Substation

Voltage level :

220

New transmission line required? :

No

Transmission line length :

0

GPS Coordinates :

Location – Site Name :

Babica BESS

Land Area :

Installed Capacity (Total MW) :

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

60000000

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

Document :

Document :