1M trees planted. Cutting carbon. Powering a greener tomorrow.

Salari Wind

Tepelenë -

Gjirokastër -

Albania

Phase

Secured

Location

Salari

Commissioned

Capacity

105

Production

331013.2

Project lifetime

About The Project

105 MW wind farm in Tepelenë (Gjirokastër) with 25 turbines of 4.2 MW, producing about 331 GWh/year (CF ~36%).

Country :

Albania

Region :

Gjirokastër

Municipality :

Tepelenë

Site Name :

Salari

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

105

EAP (MWh/year) :

331013.2

Capacity Factor :

36.0

Installed Capacity :

105

Capacity Factor :

36.0

PV capacity DC :

Number Of Turbines :

25

BESS Power :

EAP :

331013.2

Land Area :

PV capacity :

Capacity Per Turbine :

4.2

BESS Energy :

BESS Techology :

Li-Ion

Connection substation :

Name Here

Voltage level :

110

New transmission line required? :

Yes

Transmission line length :

GPS Coordinates :

Location – Site Name :

Salari

Land Area :

Installed Capacity (Total MW) :

105

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

331013.2

Document :

Document :