Progonat Wind – Tepelenë

Tepelenë -

Gjirokastër -

Albania

Phase

Secured

Location

Progonat (Tepelenë sector)

Commissioned

Capacity

109.2

Production

260315.0

Project lifetime

About The Project

109.2 MW wind project in Tepelenë (Gjirokastër) with 26 turbines of 4.2 MW, producing about 260 GWh/year (CF ~25%).

Country :

Albania

Region :

Gjirokastër

Municipality :

Tepelenë

Site Name :

Progonat (Tepelenë sector)

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

109.2

EAP (MWh/year) :

260315.0

Capacity Factor :

25.4

Installed Capacity :

109.2

Capacity Factor :

25.4

PV capacity DC :

Number Of Turbines :

26

BESS Power :

EAP :

260315.0

Land Area :

PV capacity :

Capacity Per Turbine :

4.2

BESS Energy :

BESS Techology :

Li-Ion

Connection substation :

New 110 kV substation (name TBD)

Voltage level :

110

New transmission line required? :

Yes

Transmission line length :

GPS Coordinates :

Location – Site Name :

Progonat (Tepelenë sector)

Land Area :

Installed Capacity (Total MW) :

109.2

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

260315.0

Document :

Document :