1M trees planted. Cutting carbon. Powering a greener tomorrow.

Progonat Wind – Gjirokastër

Gjirokastër -

Gjirokastër -

Albania

Phase

Secured

Location

Progonat (Gjirokastër sector)

Commissioned

Capacity

147.0

Production

418285.5

Project lifetime

About The Project

147 MW wind farm in Gjirokastër with 35 turbines of 4.2 MW, generating around 418 GWh/year (CF ~25%).

Country :

Albania

Region :

Gjirokastër

Municipality :

Gjirokastër

Site Name :

Progonat (Gjirokastër sector)

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

147.0

EAP (MWh/year) :

418285.5

Capacity Factor :

25.4

Installed Capacity :

147.0

Capacity Factor :

25.4

PV capacity DC :

Number Of Turbines :

35

BESS Power :

EAP :

418285.5

Land Area :

PV capacity :

Capacity Per Turbine :

4.2

BESS Energy :

BESS Techology :

Li-Ion

Connection substation :

New 110 kV substation (name TBD)

Voltage level :

110

New transmission line required? :

Yes

Transmission line length :

GPS Coordinates :

Location – Site Name :

Progonat (Gjirokastër sector)

Land Area :

Installed Capacity (Total MW) :

147.0

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

418285.5

Document :

Document :