1M trees planted. Cutting carbon. Powering a greener tomorrow.

Kullurica PV Site

South Albania -

Albania

Phase

Secured

Location

Kullurica

Commissioned

Capacity

20

Production

30000

Project lifetime

About The Project

20 MW PV project on 20 ha in Kullurica, South Albania; ~30 GWh/year, part of the South Albania PV cluster.

Country :

Albania

Region :

South Albania

Municipality :

Site Name :

Kullurica

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

20

EAP (MWh/year) :

30000

Capacity Factor :

17.1

Installed Capacity :

20

Capacity Factor :

17.1

PV capacity DC :

20

Number Of Turbines :

BESS Power :

EAP :

30000

Land Area :

20

PV capacity :

Capacity Per Turbine :

BESS Energy :

BESS Techology :

Li-Ion

Connection substation :

Babica 220 kV Substation

Voltage level :

220

New transmission line required? :

Yes

Transmission line length :

100

GPS Coordinates :

Location – Site Name :

Kullurica

Land Area :

20

Installed Capacity (Total MW) :

20

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

CAPEX per MW :

350000

Estimated payback period :

5.7

Estimated Annual Production :

30000

Document :

Document :