Dropull Wind 2

Dropull -

Gjirokastër -

Albania

Phase

Secured

Location

Dropull Wind 2

Commissioned

Capacity

74.4

Production

202588.1

Project lifetime

About The Project

74.4 MW expansion in Dropull (Gjirokastër) with 12 turbines of 6.2 MW, generating about 203 GWh/year (CF ~31%).

Country :

Albania

Region :

Gjirokastër

Municipality :

Dropull

Site Name :

Dropull Wind 2

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

74.4

EAP (MWh/year) :

202588.1

Capacity Factor :

31.1

Installed Capacity :

74.4

Capacity Factor :

31.1

PV capacity DC :

Number Of Turbines :

12

BESS Power :

EAP :

202588.1

Land Area :

PV capacity :

Capacity Per Turbine :

6.2

BESS Energy :

BESS Techology :

Li-Ion

Connection substation :

New 110 kV substation (shared, name TBD)

Voltage level :

110

New transmission line required? :

Yes

Transmission line length :

GPS Coordinates :

Location – Site Name :

Dropull Wind 2

Land Area :

Installed Capacity (Total MW) :

74.4

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

202588.1

Document :

Document :