About The Project

Proposed 400 MWh utility-scale battery at Babica 220 kV substation to support 377 MW PV cluster, ~60 M€ CAPEX and 2–3 year payback for storage.

Country :

Albania

Region :

South Albania

Municipality :

Site Name :

Babica BESS

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

EAP (MWh/year) :

Capacity Factor :

Installed Capacity :

Capacity Factor :

PV capacity DC :

Number Of Turbines :

BESS Power :

EAP :

Land Area :

PV capacity :

Capacity Per Turbine :

BESS Energy :

400

BESS Techology :

Li-Ion

Connection substation :

Babica 220 kV Substation

Voltage level :

220

New transmission line required? :

No

Transmission line length :

0

GPS Coordinates :

Location – Site Name :

Babica BESS

Land Area :

Installed Capacity (Total MW) :

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

60000000

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

Document :

Document :