1M trees planted. Cutting carbon. Powering a greener tomorrow.

Dropull Wind 1

Dropull -

Gjirokastër -

Albania

Phase

Secured

Location

Dropull Wind 1

Commissioned

Capacity

20

Production

67200

Project lifetime

About The Project

20 MW wind project in Dropull (Gjirokastër) with 5 turbines of 4 MW, producing about 67 GWh/year (CF ~31%).

Country :

Albania

Region :

Gjirokastër

Municipality :

Dropull

Site Name :

Dropull Wind 1

GPS Coordinates :

Financing Status :

Secured

Project Year :

Installed Capacity (Total MW) :

20

EAP (MWh/year) :

67200

Capacity Factor :

31.2

Installed Capacity :

20

Capacity Factor :

31.2

PV capacity DC :

Number Of Turbines :

5

BESS Power :

EAP :

67200

Land Area :

PV capacity :

Capacity Per Turbine :

4.0

BESS Energy :

BESS Techology :

Li-Ion

Connection substation :

New 110 kV substation (shared, name TBD)

Voltage level :

110

New transmission line required? :

Yes

Transmission line length :

GPS Coordinates :

Location – Site Name :

Dropull Wind 1

Land Area :

Installed Capacity (Total MW) :

20

Development Start Date :

Ready-to-Build (RTB) Date :

Construction Start Date :

Commercial Operation Date :

Total Investment :

CAPEX per MW :

Estimated payback period :

Estimated Annual Production :

67200

Document :

Document :