South Albania BESS Project

Vlorë Municipality -

Jugu i Shqipërisë -

Shqipëri

Faza

E Sigururar

Lokacion

Babica BESS

E Komisionuar

Kapaciteti

Prodhimi

Jetëgjatësia E Projektit

2024

Rreth Nesh

Proposed utility-scale battery energy storage system (BESS) of up to 400 MWh located at the Babica 220 kV substation in southern Albania. The project is part of EU Green Energy’s framework agreement with Energy Vault to deploy large-scale storage assets supporting renewable energy integration and grid flexibility.

Country :

Shqipëri

Rajoni :

Shqipëria E Jugut

Bashkia :

Vlorë Municipality

Emri i Vendit:

Babica BESS

Koordinatat GPS :

Statusi i Financimit :

E Sigururar

Viti i Projektit :

2024

Kapaciteti i Instaluar (Totali MW) :

EAP (MWh/vit) :

Faktori i Kapacitetit :

Kapaciteti i Instaluar

Faktori i Kapacitetit :

Kapaciteti PV DC :

Numri i Turbinave :

Energjia BESS :

EAP :

Sipërfaqja e Tokës :

Kapaciteti PV :

Kapaciteti për Turbinë :

Energjia BESS :

400

Teknologjia BESS :

Lithium-ion Battery Energy Storage System (BESS)

Nënstacioni i Lidhjes :

Nënstacioni Babica 220 kV

Niveli i Voltazhit:

220

A nevojitet linjë e re transmetimi? :

No

Gjatësia e linjës së transmetimit :

0

Koordinatat GPS :

Vendndodhja – Emri i Vendit :

Babica BESS

Sipërfaqja e Tokës :

Kapaciteti i Instaluar (Totali MW) :

Data e Fillimit të Zhvillimit :

Data e Gatshme për Ndërtim (RTB) :

Data e Fillimit të Ndërtimit :

Data e Fillimit të Operimit Komercial :

Investimi Total :

60000000

CAPEX për MW :

Periudha e parashikuar e kthimit të investimit :

Prodhimi Vjetor i Parashikuar :

Dokumenti :

Dokumenti :