Photovoltaic project
Solar Power
Our team of dedicated specialists is proud on the following solar power projects proposed and committed to implement them in Partnership.
Photovoltaic project
i. Photovoltaic project
iv. Photovoltaic project
ii. Photovoltaic project
iii. Photovoltaic project
4
Project Study
Wind Power
“EU Green Energy” team of dedicated specialists is proud on the following wind projects proposed and committed
to implement them through a strategic financial partnership.
Project Study
i. Project Study
iv. Project Study
ii. Project Study
iii. Project Study
Project Finish & on Going
Hydro Power
“EU Green Energy” team of dedicated specialists is proud on the following wind projects proposed and committed
to implement them through a strategic financial partnership.
Completed and in operation Projects
i. Operation Projects
Design and construction of the first phase of the hydro power plant 3.8 MW, Librazhd and the second phase 2.4 MW;
ii. Operation Projects
Projection and implementation of the 520 kW hydro power plant Fushe Arrez, Puke, the first phase of the project of the 9.6 MW Goska hydro power cascade project, Puke consisting of 5 hydro power plants.
iii. Operation Projects
Projection and construction of the 2.4 MW Gjegjan hydro power plant, Puke and 1.5 MW Bisak, Mirdite for the company “A&S Energy” sh.p.k.
In Development Projects
i. On Going
The final phase of the project-design for the 30 MW cascade of the Shkumbin River (medium flow) and the 30 MW cascade in the Gostima River (Shkumbin River branch), complex project: Energy – Irrigation-Drinking water;
ii. On Going
Design of the 7.2 MW hydro power cascade, with 5 hydro power plants, Staravecke – Skrapar, for the concessionaire “KroiMbret” sh.p.k .
iii. On Going
Design of the hydro power cascade in the river Gjader 24 MW, with 6 hydro power plants, for a group of concessionaires;